Featured Projects

Steel Trusses Support System

Location: Kingdom of Saudi Arabia Next Project > < Previous Project

As a part of the larger Grand Holy Mosque project, there have been several cases of renovations & demolition of old structures. A lot of demolition has taken place, specifically in the Mataf area of the mosque (around the Kabaa) where the old Turkish domes were previously standing. To ensure continuity of movement of the pilgrims and a fast paced construction process, a solution had to be engineered to cast the 2nd floor slabs without shoring. GHI successfully developed and coordinated the erection of the temporary steel trusses to support 2nd floor slabs within a very challengin time frame.